Your project selection
Consulting
and
Railway Equipment

Advertising systems in train stations of DB AG, location Berlin

Ströer Media Deutschland GmbH

2011 - 2020


3.000.000 €


CFR project stages1 to 5

CFR areas of action A, B and D

Implementation of AAQ procedure (DB S&S AG)

Interface management

Organisation/coordination

Information/documentation

Scheduling

Implementation planning 50 Hz

ABS 38: Two track expansion Altmühldorf - Tüßling

DB ProjektBau GmbH

2013 - 2019


130.000.000 €


Local construction supervision, subsection site management

Civil engineering and superstructure on tracks and train station area

Constructive civil engineering

Cable laying

Command and signalling systems

50 Hz systems

Consideration of later electrification

Train station scrutinisation Hagen - north connection, lines 66-70 and 77-79

DB Netz AG

2016 - 2018


800.000 €


On-site building inspection

Rail building inspection pursuant to VVBau

Rail building inspection pursuant to VVBau-50 Hz

Electrification of the Filzenexpress, route 5710

DB RegioNetz Infrastruktur GmbH

2016


22.000.000 €


Creation of a feasibility study, including cost estimation

Rail power systems incl. substations/switch posts, feed in and bypass lines

Overhead contact line systems

Local control systems (LCS) incl. connection of central switching point

Transport facilities (platforms, railway crossings, rails, road)

Constructive civil engineering

Control command and signalling (signal boxes and railway crossings)

Electrical equipment 50 Hz (power supply, earthing, meshing)

Complex measure “Weimar 2010” Weimar train station – Vieselbach train station, replacement of overhead contact lines

DB ProjektBau GmbH

2009 - 2014


14.800.000 €


Construction supervision

Electronic signal box Leipzig-Leutzsch/Plagwitz

DB ProjektBau GmbH

2011 - 2014


74.000.000 €


Construction supervision overhead contact line systems

Acceptance of 50 Hz systems

Renewal of the 110 kV traction power network 302, Großkorbetha - Gößnitz

DB Energie GmbH

2011 - 2012


Construction supervision

Supervision of foundation civil engineering, foundation reinforcement (plates, steps and/or heads), inner earthing, concreting, mast pre-assembly, fittings assembly, assembly auxiliary cross beams, assembly of auxiliary portals, cabling work

Checks of contractor implementation on the basis of project schedule, adherence to safety regulations, equipment

Participation in approvals by client

Deadline monitoring

Supporting contractor with regards to local coordination with property owners and authorities

Participation in taking possession of the property, and clarification of authorisation of access

Rebuild Train marshalling yard Duisburg-Ruhrort port

DB Netz AG

2007 - 2011


3.500.000 €


Coordination of task

Planning guidance and security technology (PT1)

Cable laying planning

Specialist planning of technical equipment

- Basic Evaluation

- Preliminary and Final Design

- Building Permission Application

- Detailed Design

Electrification Hamburg – Lübeck – Travemünde

Balfour Beatty Rail GmbH

2007 - 2008


165.000.000 €


Overall coordination of the building measure

Metro Jakarta – Inspection of signalling technology

Ministry of transport of the Republic of Indonesia, main department for land transport (represented by KfW, German government-owned development bank)

2005


50.000.000 €


Stocktaking and analysis of signalling technology, train radio and telecommunication

Development of a technical specification for upgrading measures

Railway junction Magdeburg 1st expansion stage electronic signal box Magdeburg

DB Projekt Verkehrsbau GmbH

2001 - 2004


150.000.000 €


Construction supervision

Health and safety coordination

Specialist planning of technical equipment

  • Show more...